MightySkins Skin Compatible with DJI Phantom 3 Standard Quadcopter Drone wrap Cover Sticker Skins Eagle Eye

★★★★★ 4.4 30 reviews

US$10.80
Price when purchased online
Free shipping Free 30-day returns

Sold and shipped by www.cccreativas.paulatrujillo.com
We aim to show you accurate product information. Manufacturers, suppliers and others provide what you see here.
US$10.80
Price when purchased online
Free shipping Free 30-day returns

How do you want your item?
You get 30 days free! Choose a plan at checkout.
Shipping
Arrives Nov 14
Free
Pickup
Check nearby
Delivery
Not available

Sold and shipped by www.cccreativas.paulatrujillo.com
Free 30-day returns Details

Product details

Management number 227587093 Release Date 2026/05/09 List Price US$10.80 Model Number 227587093
Category

Give your DJI Phantom 3 Standard Quadcopter Drone a stylish look and protect it from nicks and scratches at the same time. MightySkins creates a whole new look that sets you apart from the crowd and makes it easy to identify your drone. This DJI Phantom 3 Standard Quadcopter Drone Skin features ultra-inks and then covered with a clear protective layer for ultimate durability. All MightySkins use a patented repositionable and removable adhesive for fast and easy installation and goo-free removal. DJI Phantom 3 Standard Quadcopter Drone is not included.

  • DECAL ONLY - DJI Phantom 3 Standard Not Included
  • Add style to your DJI Phantom 3 Standard Quadcopter Drone
  • Quick and easy to apply
  • Protect your DJI Phantom 3 Standard Quadcopter Drone from dings and scratches
  • PROUDLY MADE IN THE USA: We Use Only 3M automotive-grade vinyl, the industry's most trusted brand, MightySkins are produced in our state-of-the-art facility in West Palm Beach, Florida.
UPC 053722243507
ASIN B01APRKKZC
Color white
Material vinyl
Brand Name MIGHTY SKINS
Model Name Phantom 3
Item Weight 0.1 Pounds
Part Number DJPHAN3STA-Eagle Eye
Skill Level Advanced
Control Type Remote Control
Manufacturer MightySkins
Model Number DJPHAN3STA-Eagle Eye
Includes Remote No
Included Components skin
Video Capture Format MP4
Warranty Description 1 month
Age Range Description Adult
Are batteries included No
Optical Sensor Technology CMOS
Includes Rechargeable Battery No
Wireless Communication Technology Wi-Fi, RF

Correction of product information

If you notice any omissions or errors in the product information on this page, please use the correction request form below.

Correction Request Form

Customer ratings & reviews

4.4 out of 5
★★★★★
30 ratings | 12 reviews
How item rating is calculated
View all reviews
5 stars
81% (24)
4 stars
5% (2)
3 stars
2% (1)
2 stars
1% (0)
1 star
11% (3)
Sort by

There are currently no written reviews for this product.